Before the first monsoon

Is waterproofing a must for a house in Kerala?

Concrete looks solid. Through a Kerala monsoon, it behaves more like a hard sponge.

Suresh Kumar · Technical Head, Construction Division ·

Two-storey contemporary house in Kaniyapuram, Trivandrum, with open roof terraces and a pergola, designed by Rzianz

Open terraces like these take the full monsoon. Kaniyapuram, Trivandrum.

Key takeaway

  • Yes. Every part of a Kerala house that meets water needs waterproofing: terraces, roof slabs, sunshades, balconies, bathrooms, kitchens, water tanks and the plinth.
  • Concrete lets water in through tiny pores, fine cracks, joints and gaps around pipes. Two monsoons a year, June to September and October to November, give that water months to find a way through.
  • Do it during construction. On a bare slab it takes days. After a leak, the tiles and plaster above it have to come off first.
  • At Rzianz, homes in Trivandrum are waterproofed with Dr. Fixit, Fosroc and Berger systems, turned 30 cm up the walls on terraces and in bathrooms, with a protective layer on top.

The roof slab is cast. The walls are going up. Then someone at the site meeting asks: is waterproofing really needed, or is it an extra?

It is a fair question. Concrete looks solid, and some older homes in Trivandrum stood for years without it.

This guide gives you a straight answer: where your house needs waterproofing, why Kerala’s weather makes it matter, and what a good job looks like. It is part of our guide to building a home in Trivandrum.

01

Why does concrete let water in?

Concrete is full of tiny pores that water creeps through, and it cracks. Fine cracks open as fresh concrete dries and shrinks, and again as a slab heats in the sun and cools in the rain. Water finds these cracks, the joints where one pour meets the next, and every gap around a pipe.

Rainwater pooling over a hairline crack in a grey concrete roof slab and seeping into it during monsoon rain

You may have heard that good concrete hardly absorbs water, and a well-made slab does absorb little. But leaks rarely come through the middle of a good slab. They come through the cracks, joints and corners, and every slab has those.

The corner where a terrace floor meets its parapet wall is the most common place a leak starts. Drain outlets and pipe openings come next.

What follows is slow. A damp patch on a ceiling. Paint that bubbles and peels, and white, salty marks on a wall.

Over the years, water that reaches the steel bars inside the slab makes them rust, and rust swells and cracks the concrete around it.

Damp brown stain with bubbling, peeling paint where a bedroom ceiling meets the wall in a Kerala home

It always starts small.
02

Why Kerala homes need it more

Kerala gets rain from two monsoons. The south-west monsoon runs from June to September, and the north-east monsoon follows in October and November. Add the storms of April and May, and a roof in Trivandrum sees rain for months at a stretch, often heavy and driven by wind.

The air rarely dries out between showers, so damp has time to travel. Heat plays its part too.

A slab that bakes on an April afternoon and then cools fast in an evening shower stretches and squeezes every day. That daily movement is what opens fine cracks.

Water does not need a big crack. It needs a small one and a lot of time.

Heavy monsoon rain running off the edge of a concrete sunshade above a window of a modern Kerala home
03

Where your house needs waterproofing

Every surface that meets water, whether from above, from inside or from the ground. In a typical Kerala home, that means eight places. The Bureau of Indian Standards names bathrooms, kitchens, toilets, balconies, verandahs and sunshades as the wet areas most open to leaks (IS 13182).

  1. Terrace and roof slabIt takes the full force of the rain, and water stands on it if the slope is poor. Most leaks start here.
  2. SunshadesRain lands on top, and water sits where the sunshade meets the wall.
  3. Balconies and open sit-outsOpen to the weather, with a door into the house right at floor level.
  4. BathroomsWater every day, under tiles. Tiles and grout are not waterproof on their own.
  5. Kitchen and utility areaWet floors around the sink and the washing area.
  6. Water tanks and sumpsWater presses on the walls all day, every day.
  7. The plinthDamp can rise from the ground into the walls unless it is stopped where the walls meet the ground.
  8. Slabs under sloped tile roofsCovered does not mean dry. Tiles can shift or crack in a storm. Wind drives rain under them. And the slab sits open to the weather for weeks while the roof goes up.
Traditional Kerala house in Sreekaryam, Trivandrum, with red clay-tile roofs, designed by Rzianz
Two-storey house in Malayinkeezhu, Trivandrum, with open balconies and railings, designed by Rzianz

Bathroom under construction with a grey waterproofing coat on the floor and turned up the walls, pipes sealed, before tiling

What a bathroom should look like before a single tile goes down.

Not sure what your estimate covers?

Ask us how each area of your home will be waterproofed, and with what.

WhatsApp us your question

04

The main methods, in plain words

There is no single best method. The right one depends on where it goes and what it will face: sun, standing water, daily use or pressure from a tank. Here is what each does.

Method What it is Best for Watch out for
Cement-based coating A cement coat brushed on in layers Bathrooms, tanks, sunshades It is rigid, so it can crack if the slab moves
Acrylic or polymer coating A rubbery, paint-like coat Exposed terraces, as a top coat It needs a fresh coat every few years in hard sun
PU (polyurethane) liquid membrane A stretchy coat with no joints Terraces and wet areas It needs a skilled, careful hand
Bitumen membrane Factory-made sheets laid and sealed Large flat roofs The joints between sheets must be perfect
Crystalline treatment Chemicals that grow crystals inside the concrete’s pores Tanks, sumps, walls below ground It cannot bridge cracks that open later
On our homes, we use systems from Dr. Fixit, Fosroc and Berger, chosen area by area.

05

What a good waterproofing job looks like

Good waterproofing is mostly about the edges and the order of work. Take this checklist on your next site visit.

Worker in safety boots brushing a grey waterproofing coat along the base of a terrace parapet wall, turned about 30 cm up the wall
  1. The floor slopes to the drain.No coating survives water that stands for weeks.
  2. The coat turns up the wall.About 30 cm on terraces and in bathrooms, 15 cm on sunshades.
  3. Corners and pipes come first.Corners get a rounded fillet and pipes get a sealed collar before the main coat.
  4. The surface is clean, dry and primed.Coating over dust or damp wastes the coating.
  5. Two coats, not one.Each coat is left to cure before the next.
  6. A protective layer goes on top.A screed, tiles or a cool-roof finish shields the coat from sun and feet.
  7. A ponding test before tiling.Block the drains, fill about 5 cm of water, wait 48 hours and check every ceiling below.
  8. It all happens before tiles and flooring.Never after.

Swipe to see the full drawing →

Terrace waterproofing, typical section A section through a terrace edge: the concrete slab, a waterproofing coat running across the slab and turned 300 mm up the parapet wall with a rounded fillet at the corner, a sloping screed and tiles on top falling to a drain outlet, with the coat dressed into the outlet. Terrace waterproofing · typical section INDICATIVE · NOT TO SCALE · RZIANZ Waterproofing Concrete Screed ROOF SLAB FALL TO DRAIN 300 mm 1 · Coat turned up the wall Two coats on a clean, primed surface 2 · Rounded fillet at the corner 3 · Screed and tiles to a fall 4 · Coat dressed into the drain
The four details that decide whether a terrace leaks: the upturn, the corner, the fall and the drain.

Ponding test on a flat Kerala house terrace, a shallow sheet of water held over the floor with the drain plugged

48 hours of standing water. If the ceiling below stays dry, the tiles can go down.
06

Is it cheaper to do now or later?

Now, by a wide margin. During construction, waterproofing goes onto a bare, clean surface in a few days.

After a leak, the tiles, screed and plaster above it have to come off first. Then someone has to find where the water is really getting in, and every layer has to be redone.

There is also the cost nobody bills you for: a stained ceiling in the bedroom, and a monsoon spent putting buckets under it.

Outdoor terrace with a timber pergola and glass railing at a home in Trivandrum built by Rzianz

A terrace you can use, not one you worry about. Trivandrum.
07

How we handle it at Rzianz

We list every waterproofed area in writing, with the method and how far the coat turns up the wall. You know exactly what is protected before the first monsoon. Rzianz has delivered more than 300 homes, with over 25 years of experience in Kerala.

Terraces, sunshades and exposed slabs get a chemical waterproofing coat turned up the walls, then a protective screed or tiled finish on top.

Bathrooms are waterproofed under the screed and tiles, 30 cm up the walls, before the Jaquar, Grohe or Kohler fittings go in. We use Dr. Fixit, Fosroc and Berger systems on our homes in Trivandrum.

  1. Tell us about your home.Send us your plot, your plans or your builder’s estimate on WhatsApp.
  2. See every area, in writing.We show you how each part of your home will be waterproofed, and with what.
  3. We build it that way.The same team that drew your home builds it, to what was written down.

For other ways a build can go wrong, read our guide to the most common building mistakes in Kerala. Holding a builder’s estimate already? Our free BOQ audit shows whether waterproofing is in it at all.

08

Questions families ask

Is waterproofing necessary for a new house in Kerala?
Yes. Every part of a Kerala house that meets water needs it: terraces, roof slabs, sunshades, balconies, bathrooms, kitchens, tanks and the plinth. Concrete is porous and cracks over time, and two monsoons a year give water months to find those cracks. Waterproofing during construction stops leaks before they start.
When should waterproofing be done during construction?
After the slab or floor is cast and has cured, and before the screed, tiles or flooring go on. Corners and pipe openings are sealed first, then two coats are applied and tested with a 48-hour ponding test. Doing it after tiling means the most important layer sits under finishes it cannot reach.
How long does waterproofing last?
It depends on the method, the sun it faces and how well it was applied. Simple coatings on an exposed terrace may need a fresh coat after a few years. A good membrane under a protective layer lasts much longer. A check of the terrace and drains before each monsoon helps any system last.
Can waterproofing be done over existing tiles?
It can, with coatings made for that purpose, but it is a repair rather than a cure. By the time a leak shows, water may already be under the tiles, and a coat on top will not reach it. For a new house, waterproof the bare slab before any tiles go down.
What is a ponding test?
It is a simple check that the waterproofing works. The drains are blocked and about 5 cm of water is filled over the area. It is left for 48 hours, though many guides say 24 to 72. Then every ceiling and wall below is checked for damp. Any sign of water means a fix before tiling.
Do I need waterproofing if my house has a sloped tile roof?
Yes. Tiles keep most of the rain off, but they can shift or crack. Wind can drive rain under them, and the slab is open to the weather while the roof goes up. Waterproofing the slab below protects the rooms underneath if the roof ever lets water through.
Design-build · one accountable team

Know what is protected before the slab is cast

Building in Trivandrum, or about to? Ask us how your home’s waterproofing will be done, area by area.

Ask about waterproofing on WhatsApp

If someone you know is building in Kerala, send them this before their roof slab is cast.

Sources. Wet areas named in IS 13182:1991 (Bureau of Indian Standards). Monsoon seasons as recorded by the India Meteorological Department. Upturn heights are the Rzianz standard for terraces, bathrooms and sunshades.

WhatsApp us about waterproofing

WhatsApp Talk to us on WhatsApp