What will your home really cost to build?
A contractor who quotes ₹1,800/sqft is not a miracle worker. They have found five places to save money you will never see. At each scene we show you exactly where those shortcuts hide.
Are you about to build a low-quality home, without realising it?
Then why a low-quality home for the next forty years of your life?
Three Rzianz tiers. Pick the one that matches the home you want for your family.
Total built-up area, all floors combined. As you type, your profile at the bottom of the screen updates in real time.
Five shortcuts that look free today. Each one breaks something tomorrow.
Both look like iron rods. Only one is real steel.
- Rerolled steelRods made by melting old scrap metal
- No company nameNot in your contract anywhere
- You cannot checkOnce inside the pillar, no way to know
- Primary steelReal iron rod from a known company
- Brand in your contractTata, Vizag, JSW, SAIL, named in writing
- Built to last the full design life of the homeThe same grade of primary steel used in infrastructure projects
A design nobody signed, against a design someone is responsible for.
- Copy a design from another houseDifferent soil, different size, different load
- No engineer's signatureNo structural engineer signs the drawings
- Cracks come, contractor disappearsYou have no document to hold him to
- Licensed Structural Engineer designs your houseSizes every pillar, support, and steel rod for your specific home
- Signed and stamped drawingsEngineer's name, seal, and license number on every page
- You keep the drawings foreverLegally accountable design. Yours to hold
Each floor multiplies the load your ground-floor pillars are asked to carry. The engineer sizes everything for that load.
Every bathroom has a hollow space under the floor where the pipes sit. If that space is filled with broken bricks and stones instead of clean sand, water finds a way down.
- Fill pipe space with construction debrisBroken bricks, tile pieces, leftover stones
- One coat of cement slurry as "waterproofing"Looks done. Often fails by the second monsoon.
- Tiles laid over the topOnce tiled, the only fix is to break it all open
- Fill pipe space with clean sand, layered and packedSand fills every gap. Water cannot find a path
- Crystalline waterproofing membraneA proper waterproof coating from Dr. Fixit or Fosroc. Engineered to last decades
- Brand and coat count in your contractWritten before any tile is laid
When the sand has too much dust, the mason adds extra water to make pouring easier. Strong concrete quietly becomes weak concrete.
- Use whatever M-sand the local supplier sendsOften dusty, unwashed crusher waste
- No supplier name in the contractYou cannot trace where the sand came from
- Mason adds extra water at the siteMakes pouring easier, weakens the concrete
- Properly washed M-sand onlySilt and dust content checked before every pour
- Quality checked at siteSilt verified before unloading, mix recipe agreed in writing
- Concrete recipe agreed before work startsThe right water-cement balance for your pillars
The ground under your house decides how deep the foundation must go. Different ground, different cost. Pick the one closest to your plot.
Ordinary wire fills your room with smoke in seconds. FRLS wire (Flame Retardant Low Smoke) gives your family time to find the door.
- Ordinary PVC wireCheaper. No fire-safety rating
- Thick black smoke when a fire startsFills the room before you can find the door
- No brand name in the quoteYou don't know what is going into your walls
- FRLS wireFlame Retardant Low Smoke, designed to stop fires from spreading
- Self-stops the fire, makes only thin smokeYour family has time to get out
- Finolex or Polycab brand in your contractWritten before any wire enters your wall
He cuts five corners and hands you a price up to ₹2.4 lakh lower.
You carry the risk for forty years.
Total contractor saving: ₹1.3 to 2.4 lakh · All absorbed by your family, over the life of the home.
You are not building a house.
You are building the place
your family will call home
for the next forty years.
A house cracks in seven years.
A home stands for fifty.
Choose which one
you are building.
Your personalised Home Reality Report is ready.
Built using your plot, size, floors, and specification choices.
Enter your WhatsApp number to open it.
We'll send your estimate on WhatsApp. A real person replies, no pressure. Built on 300+ Kerala homes.
Your home will really cost
Enter your number above to reveal.
Anyone quoting you less is asking you to absorb the risk yourself.
What you can do with this estimate, starting today
- Full structure: foundation, columns, beams, slabs
- Brickwork, plastering, flooring
- Electrical wiring and switchboards
- Plumbing, pipes, and drainage
- Doors, windows, and grilles
- Bathroom waterproofing and sanitary fittings
- Land / plot cost
- Permit fees (KMBR, KSEB, local body)
- Architect and structural engineer fees
- Soil testing and report
- Compound wall and gate
- Borewell or well
- Modular kitchen and furniture
- Generator or solar installation
- Landscaping and driveway
If a contractor includes the above items in a "construction quote" without clearly listing them as separate line items, ask them to break it out.
Want this report saved for later?
We'll email you the full report as a beautifully designed message. Open it on any phone, save it, print it, or forward it.
- 48% Structure
- 36% Finishing
- 16% Electrical & Plumbing
Run a 5-second sanity check on your builder's number
Type your builder's total. We show where the gap likely hides.
Raw materials for your build. If a quote uses far less, ask why.
You chose Comfort. Here is what changes if you go up or down.
Same plot, area and floors. Only materials and finishes change.
Comfort is the honest minimum for a home that lasts. See what each rate buys →
Numbers above update as you type.
- Primary TMT steel. Brand named in your contract. No rerolled bars.
- Structural Engineer drawings. Signed, sealed, and yours to keep.
- Electrical and plumbing coordinated. Drawn together before any slab is cast.
- Crystalline waterproofing. Dr. Fixit or Fosroc. Brand and method in writing.
- Verified M-sand and concrete mix. Checked on site before every pour.
- Finolex or Polycab FRLS wiring. Flame Retardant Low Smoke. Brand named in your contract.
- Walls primed and ready. Painting is quoted separately by Rzian Interiors.
₹1,800 is a stripped-down base rate. It assumes rerolled steel, no Structural Engineer, no waterproofing, and the cheapest wire.
Families like yours, recent builds.
Recent Rzianz projects close to your home profile. Names anonymised by request, every other detail verified.
Which one is right for you?
I want a Rzianz engineer to talk to me
A 30-minute conversation, no obligation. We walk you through your specific numbers and answer your build questions.
One honest warning: our start is slower. Drawings, soil test and a written BOQ come before the first brick.
Open WhatsApp →I already have a builder's quote. Audit it
An 8-question diagnostic that surfaces what your builder has left out. Upload your BOQ; a Rzianz engineer marks the missing items.
Run the audit →I need architect drawings before I think about cost
Meet the architects we work with in Kerala. They design with construction reality in mind, not just renders.
See our architects →Send me the report by email
Get the full estimate in a beautifully formatted message. Open it on any phone, forward to your family, or print it for a contractor meeting.
Email the report →