What will your home really cost to build?
Are you about to build a low-quality home, without realising it?
Then why a low-quality home for the next forty years of your life?
We will use your name through the rest of this page. Nothing else.
Three Rzian tiers. Pick the one that matches the home you want for your family.
Total built-up area, all floors combined. As you type, your profile at the bottom of the screen updates in real time.
Six shortcuts that look free today. Each one breaks something tomorrow.
Both look like iron rods. Only one is real steel.
- Rerolled steelRods made by melting old scrap metal
- No company nameNot in your contract anywhere
- You cannot checkOnce inside the pillar, no way to know
- Primary steelReal iron rod from a known company
- Brand in your contractTata, Vizag, JSW, SAIL, named in writing
- Built to last the full design life of the homeThe same grade of primary steel used in infrastructure projects
A design nobody signed, against a design someone is responsible for.
- Copy a design from another houseDifferent soil, different size, different load
- No engineer's signatureNo structural engineer signs the drawings
- Cracks come, contractor disappearsYou have no document to hold him to
- Licensed Structural Engineer designs your houseSizes every pillar, support, and steel rod for your specific home
- Signed and stamped drawingsEngineer's name, seal, and license number on every page
- You keep the drawings foreverLegally accountable design. Yours to hold
Each floor multiplies the load your ground-floor pillars are asked to carry. The engineer sizes everything for that load.
Every bathroom has a hollow space under the floor where the pipes sit. If that space is filled with broken bricks and stones instead of clean sand, water finds a way down.
- Fill pipe space with construction debrisBroken bricks, tile pieces, leftover stones
- One coat of cement slurry as "waterproofing"Looks done. Often fails by the second monsoon.
- Tiles laid over the topOnce tiled, the only fix is to break it all open
- Fill pipe space with clean sand, layered and packedSand fills every gap. Water cannot find a path
- Crystalline waterproofing membraneA proper waterproof coating from Dr. Fixit or Fosroc. Engineered to last decades
- Brand and coat count in your contractWritten before any tile is laid
When the sand has too much dust, the mason adds extra water to make pouring easier. Strong concrete quietly becomes weak concrete.
- Use whatever M-sand the local supplier sendsOften dusty, unwashed crusher waste
- No supplier name in the contractYou cannot trace where the sand came from
- Mason adds extra water at the siteMakes pouring easier, weakens the concrete
- Properly washed M-sand onlySilt and dust content checked before every pour
- Quality checked at siteSilt verified before unloading, mix recipe agreed in writing
- Concrete recipe agreed before work startsThe right water-cement balance for your pillars
The ground under your house decides how deep the foundation must go. Different ground, different cost. Pick the one closest to your plot.
Ordinary wire fills your room with smoke in seconds. FRLS wire, Flame Retardant Low Smoke, gives your family time to find the door.
- Ordinary PVC wireCheaper. No fire-safety rating
- Thick black smoke when a fire startsFills the room before you can find the door
- No brand name in the quoteYou don't know what is going into your walls
- FRLS wireFlame Retardant Low Smoke, designed to stop fires from spreading
- Self-stops the fire, makes only thin smokeYour family has time to get out
- Finolex or Polycab brand in your contractWritten before any wire enters your wall
A proper wall takes six coats. The cheap version is two. The walls tell the truth six months in.
- Primer + emulsion only, two coats totalThe putty layer that smooths the wall is skipped
- No brand named in the quoteWhatever paint is cheapest that week
- The walls look shabby in 6 monthsBrush marks visible. Rough texture. Marks show up easily.
- Six coats total, every one named1 coat primer → 2 coats putty → 1 coat primer → 2 coats Premium Acrylic Emulsion
- Asian Paints, Berger, or Nerolac in your BOQBrand and coverage area written before work starts
- Walls smooth as silkThe way a finished home should feel under your hand on day one and day 1,000
You are not building a house.
You are building the place
your family will call home
for the next forty years.
A house cracks in seven years.
A home stands for fifty.
Choose which one
you are building.
Your personalised Home Reality Report is ready.
Built using your plot, size, floors, and specification choices.
Your phone number lets a Rzian engineer reach you if you ever want to talk. We will not spam you, sell your number, or make a sales call.
Built on 300+ Trivandrum homes. Replies within a few hours, from an engineer, not a sales rep.
Your home will really cost
Enter your number above to reveal.
Anyone quoting you less is asking you to absorb the risk yourself.
What you can do with this estimate, starting today
Want this report saved for later?
We'll email you the full report as a beautifully designed message, open it on any phone, save it, print it, or forward it.
Run a 5-second sanity check on your builder's number
Type the total quote your contractor gave you. We compare it against the realistic range for your home and tell you where the gap likely hides.
Estimated raw materials for your build. Take this to any supplier or contractor for verification. If a quote uses dramatically less than this, ask why.
You chose Comfort. Here is what changes if you go up or down.
Same plot, same area, same floors. Only the materials and finishes change.
All numbers above update as you change this.
- Primary TMT steel. Brand named in your contract. No rerolled bars.
- Structural Engineer drawings. Signed, sealed, and yours to keep.
- Electrical and plumbing coordinated. Pipe and wire routes drawn together on paper before any slab is cast.
- Crystalline waterproofing. Dr. Fixit or Fosroc. Brand and method in writing.
- Verified M-sand and concrete mix. Sand quality checked on site, mix recipe agreed before every pour.
- Finolex or Polycab FRLS wiring. Flame Retardant Low Smoke. Brand named in your contract.
- Six-coat paint system. 1 primer → 2 putty → 1 primer → 2 Premium Acrylic Emulsion. Walls smooth as silk. Brand and coverage in writing.
The gap is not because a contractor lied. It is because ₹1,800 is a stripped-down base rate. It assumes rerolled steel, no Structural Engineer, skipped waterproofing, and the cheapest wire and paint. Those are the choices that make ₹1,800 possible.
Families like yours, recent builds.
Three recent Rzian projects close to your home profile. Names anonymised by request, every other detail verified.
Which one is right for you?
I want a Rzian engineer to talk to me
A 30-minute conversation, no obligation. We walk you through your specific numbers and answer your build questions.
Open WhatsApp →I already have a builder's quote, audit it
An 8-question diagnostic that surfaces what your builder has left out. Upload your BOQ; a Rzian engineer marks the missing items.
Run the audit →I need architect drawings before I think about cost
Meet the architects we work with in Trivandrum. They design with construction reality in mind, not just renders.
See our architects →